Week 8: SATURN 01 Returned

8/2/10
   Katie, Michael, and I went to SAT 03 and cleaned the tubes out with bleach. Katie and I cut some electro-mechanical (EM) cable for SAT 01 and prepared it for deployment.

8/3/10
   Katie, Michael, Greta and I went to SAT 01 to replace it. When we got their the EM cable Katie and I made broke so we all had to go back to the shop to repair it. After it was fixed we went back out to SAT 01 and successfully deployed it.

8/4/10
   Katie and I went to SAT 3 to do the daily cleaning, and then we went to the NOAA vessel the Magister to install the computer for the flow-through device that is going to be installed on it. This device provide yet another avenue for CMOP to acquire data.

8/5/10

   I  worked on paper and coding.

8/6/10

   Greta and I put everything back in the storage container from when we took it all out a few weeks ago. The leak in the roof has been fixed and it is far better organized than it ever was.

Next week I'll hopefully be able to go out and retrieve the glider.