All day Monday I worked on my final report and read more primary literature. Tuesday and Wednesday I was at Sharp and continued to test different parameters on the biosensors. Some of the sensors were functionalized (probes attached to the surface) alongside of a synthetic molecule called MCH that previous literature reported would decrease the amount of non-specific binding of the targets to the probes. The little preliminary runs that I performed did not show this. I did find some optimal parameters for the biosensors: 2XSSPE buffer, 75 Hz, 75 mV.
Thursday I went on the trip to Astoria and we helped Sheedra with her water sampling at three different sites. We then got a tour of CMOP in Astoria, and the low-down on the function and importance of the 4 Saturn stations.
Today was the grant proposal writing workshop. It was very informative, and really drilled in some important points to think about before even beginning any writing.